FVG Construction were the Main Contractors for this project. The design for the waterproofing and radon protection of the lift pit was completed by SURFASOLOGY. The design included a provision for a connection between the lift pit membrane and the loose laid radon barrier. The lift pit subbase was prepared by FVG Construction. Hollywell Construction… Continue reading Lift Pit Waterproofing – Scoil Fhursa, Galway
![](https://surfasology.ie/wp-content/uploads/2021/09/FVG-700x460-1.jpg)