Ashford Castle Hotel – Basement & Swimming Pool Waterproofing

Description

The highly reputable EJ Deacy Contractors & Industrial Maintenance Ltd. are the Main Contractors on this highly prestigious project located on the grounds of the beautiful Ashford Estate.

John Britton are the Consulting Structural and Civil Engineers for the project.

Waterproofing specialists SURFASOLOGY were appointed to design and install the waterproofing and protection systems for the below-ground reinforced concrete structure and for the waterproofing of the swimming pool.

The highly tested DualProof Membrane System was selected for the waterproofing and protection of the below-ground structure, whilst the Drizoro Waterproofing System was chosen for waterproofing the Swimming Pool.

Both systems are fully approved and have an excellent track record on some Internationally known projects.

The formwork / concrete contractors Headford Construction worked in sequence with the SURFASOLOGY approved installers team from Hollywell Construction to ensure the waterproofing/protection systems were installed correctly.

Details

Type of Job Basement & Swimming Pool Waterproofing
Products DualProof T, DualProof S, Quellmax Plus, CEMflex VB Plate, CEMswell, Maxrite 500, Maxseal Flex, Termination Rail
Main Contractors

Sub-Contractor

EJ Deacy Contractors & Industrial Maintenance Ltd.

SURFASOLOGY

Location Cong, Co. Mayo
Construction Completion 2019

Related Projects

Dear Customers,

High performance Resin Flooring Solutions by Sherwin Williams are now available from SURFASOLOGY.

We offer seamless, resinous flooring systems that combine durability and design aesthetics. The product line covers a multitude of industries and areas of application, such as industrial & manufacturing, pharmaceutical & healthcare, food & beverage.

Are you currently working on a flooring project and looking for a solution? For advice and guidance, please contact us on 01 832 1005 or [email protected].

Your SURFASOLOGY Team