Jones Engineering are the Main Contractors for this ultra-modern facility.
SURFASOLOGY were contracted to complete some refurbishment works, these works included localised injection of polyurethane resin, concrete repair, joint sealing and partial waterproofing and protection of specific reinforced concrete walls.
All products used for these works are fully approved. SURFASOLOGY supplied and installed the materials.