Set in the heart of Dublin’s thriving docklands with a unique frontage to the Grand Canal Dock, this exciting new landmark development transforms the Dublin skyline and surrounding urban landscape. The development is a combination of new build and refurbished space within the industrial heritage buildings on site, creating a pleasant and lively new city… Continue reading Podium Deck Waterproofing – Boland’s Quay, Dublin 2
Balroy Hall Development combines premium amenities with an unbeatable location in the leafy surrounds of Castleknock. These thoughtfully designed A-rated energy efficient apartments were developed by Glenveagh Homes and offer spacious balconies, large onsite playground, and ample parking among other features. Basement Waterproofing SURFASOLOGY’s task consisted of waterproofing and protection of below ground reinforced concrete… Continue reading Basement & Podium Deck Waterproofing – Balroy Hall, Carpenterstown
Residential development of family homes located in the popular Citywest area. Set on the doorstep of Dublin City Centre, Barnoaks was built by Glenveagh Homes to the highest possible standard. SURFASOLOGY were appointed as a waterproofing specialist on this high-profile project with a task to waterproof and protect below ground reinforced concrete base slab, retaining… Continue reading Waterproofing of Basement & Balconies – Barnoaks, Citywest
Lakeland Dairies is one of the largest dairy co-operatives in Europe with a rich history dating back nearly 130 years, which is committed to serving the needs of farmers, customers and communities. Over the years the wastewater caused descaling and damage to the reinforced concrete in the waste-water containment tanks in the Lakeland Dairies Complex.… Continue reading Lakeland Dairies Complex – Repair & Restoration of Wastewater & Sewerage Facilities
FVG Construction were the Main Contractors for this project. The design for the waterproofing and radon protection of the lift pit was completed by SURFASOLOGY. The design included a provision for a connection between the lift pit membrane and the loose laid radon barrier. The lift pit subbase was prepared by FVG Construction. Hollywell Construction… Continue reading Lift Pit Waterproofing – Scoil Fhursa, Galway
SURFASOLOGY provided the waterproofing and radon protection of the below-ground reinforced concrete on this Simon J Kelly Architects designed new school building in Tuam, Co. Galway. The construction works were completed by the well-known Galway construction company Carey Building Contractors Ltd. To protect the reinforced concrete slab DualProof T Membrane was pre-applied and the reinforced… Continue reading St. Oliver’s School, Tuam – Structure Waterproofing & Radon Protection
The DualProof System was selected as the preferred system for the waterproofing and protection option of the Lift Pit of this project. Construction non-movement joints were detailed with CEMflex VB Plate Waterstop. All products used were from the SURFASOLOGY range. SURFASOLOGY completed the installation works for Kesel Construction Ltd – the main contractors on this… Continue reading Galway Community College – Lift Pit Waterproofing
The Royal College of Surgeons (RCSI) academic and education building has become the largest redevelopment project in the City Centre in recent years. The facility comprises a state of the art surgical and clinical training suite containing a flexible wet lab, mock operating theatre, clinical training wards, standardised patients rooms and task training rooms. It… Continue reading Royal College of Surgeons (RCSI), Dublin – Basement Waterproofing
A major refurbishment of this landmark building was completed by Halton Construction. The fitout works transformed the building into luxurious office space for The Jones Engineering Group Head Office. The fitout works included remedial works to the basement area. SURFASOLOGY complete partial waterproofing to the walls using the Drizoro Waterproofing System. The works included stopping… Continue reading Jones Engineering HQ Refurbishment – Dublin
Situated in Dublin’s most established office quarter, this award-winning project is one of Dublin’s newest Fitouts was completed in 2019 by John Sisk and Son. SURFASOLOGY were commissioned to supply and install a liquid waterproof coating to the floor and a waterproof coating to the gypsum plaster walls of selected areas of the building. These… Continue reading IDA, Three Park Place – Liquid Waterproofing