Grangegorman Bus Park, Dublin

A new bus parking structure was constructed on the east side of the Grangegorman site to provide Dublin Bus with necessary parking space as part of preparation work for the development of the Luas Cross City Line. SURFASOLOGY worked closely with both the main contractor (Clancy Construction) and the design team (O’Connor Sutton Cronin) offering… Continue reading Grangegorman Bus Park, Dublin

Mary McAleese (Boyne) Bridge

The landmark structure consists of a 350m long, cable-stayed, high level bridge carrying the M1 Northern Motorway (Dublin-Belfast) across the River Boyne to the west of Drogheda. Boyne Cable Bridge is the largest bridge project in this country in recent decades. The bridge was awarded both the IEI Morgan Sheehy Medal and the ACEI President’s… Continue reading Mary McAleese (Boyne) Bridge

West Link Toll Bridge

The West-Link Toll Bridge was conceived and constructed as a convenience for the motorist and commercial road user, as an aid to economic activity in Dublin and beyond, and a profitable enterprise for National Toll Roads. It opened in 1990 as part of the Western Parkway, a stretch of motorway just over 12 kilometres long… Continue reading West Link Toll Bridge

Croke Park

Located close to Dublin city centre, Croke Park is one of the largest in Europe, with a capacity of 82,300 and can accommodate all types of events – from field sports to concerts, meetings to tradeshows and bespoke banqueting. Always a Good Team IBC Limited played a blinder on the Croke Park Project supplying admixtures,… Continue reading Croke Park

Dublin Port Tunnel

Dublin Tunnel opened to traffic on december 20th, 2006. It is a twin bore tunnel of 4.5km in length with a height clearance of 4.65m. It is part of the M50 motorway and completes the northern part of the C-Ring around Dublin city. Planning for Dublin Tunnel started approximatel ten years prior to commencement of… Continue reading Dublin Port Tunnel

Aviva Stadium

The Aviva Stadium – home of Ireland’s international rugby and soccer teams – is located in Dublin and has a capacity for 51,700 spectators. Build on the site of the former Lansdowne Road stadium, Aviva stadium officially opened on 14 May, 2010. IBC Limited sealed the construction joints using CEMflex VB Plate Waterstop and Quellmax… Continue reading Aviva Stadium

Tanking of Attenuation Tanks – Clonshaugh Hotel, Dublin

One of Ireland’s longest established building contractors Stewart Construction are the Main Contractors of this new hotel complex at Clonshaugh, Dublin 17. SURFASOLOGY were tasked with supplying and installing a waterproof and protection coating for the reinforced concrete of the Attenuation Tanks on this project. This project is located close to Dublin Airport and it… Continue reading Tanking of Attenuation Tanks – Clonshaugh Hotel, Dublin

Below Ground Waterproofing, Knocknacarra

The below ground waterproofing of this JJ Rattigan Project in Galway was completed using the combined efforts of the Sub-Contractors under the supervision of SURFASOLOGY. Waterproofing of the Lift Pits, Pipe penetrations and the sealing of a design joint were completed by SURFASOLOGY applicators using such products as DualProof Membrane, Quellmax Plus, Maxseal Super and… Continue reading Below Ground Waterproofing, Knocknacarra

Roscommon Arts Centre – Lift Pit Waterproofing

Products from the SURFASOLOGY range were specified for the waterproofing of the Lift Pit of this well-known building in Roscommon Town. The installation of our approved products DualProof Membrane, CEMflex VB Plate, Quellmax Plus and Maxseal Super were completed by approved applicators HCL under the guidance of SURF

Swimming Pool Waterproofing, Co. Meath

Woodlawn Developments were the main contractors of this magnificent private residence located in beautiful County Meath. SURFASOLOGY took on this project that involved concrete repairs and the installation of the waterproofing system to the swimming pool area of this very exclusive property. All products used were from the Drizoro Construction Products range.

Jamie Smyth

Quantity Surveyor

Jamie brings our team a wealth of knowledge in project costs management, from the cost and risk analysis to the preparation and submissions of tenders and valuations.


Jamie has spent over ten years working as a Quantity Surveyor with a background in the construction industry (from residential build to pharma projects). He has been involved in all aspects of construction collaborating with small builders and large contractors on projects of varying sizes and scale. All this contributed to his thorough understanding of the requirements and priorities when performing his tasks of a Quantity Surveyor.


On a personal note, Jamie enjoys playing soccer and is a true golf fanatic. He enjoys travelling and fine dining.

Dear Customers,

High performance Resin Flooring Solutions by Sherwin Williams are now available from SURFASOLOGY.

We offer seamless, resinous flooring systems that combine durability and design aesthetics. The product line covers a multitude of industries and areas of application, such as industrial & manufacturing, pharmaceutical & healthcare, food & beverage.

Are you currently working on a flooring project and looking for a solution? For advice and guidance, please contact us on 01 832 1005 or [email protected].

Your SURFASOLOGY Team